Fangxi Reservoir Water Diversion and Supporting Water Plant Project (Tunnel Section)

Project

Fangxi Reservoir Water Diversion and Supporting Water Plant Project (Tunnel Section)

 

Cooperation Unit

China Railway 19th Bureau Group Co., Ltd.

 

Introduction

The Fangxi Reservoir Water Diversion Tunnel is a key component of Linhai City’s major livelihood project, the "West-to-East Water Diversion" initiative. The total tunnel length is 10.78 kilometers, including a 240-meter drill-and-blast section and a 10,537-meter TBM excavation section. The geological conditions along the route are complex, primarily consisting of rhyolitic tuff with breccia, crystal fragments, and vitric components. Challenges include extremely hard rock formations and water inflow, with tunnel depths varying significantly—ranging from a minimum of 29.4 meters to a maximum of approximately 800 meters. The tunnel was excavated using a full-face hard rock tunnel boring machine (TBM) manufactured by CRCHI.


TBM Cutterhead Configuration: 17-inch twin disc cutters,18-inch single disc cutters, Scrapers.

 

Cooperation Mode

TBM cutter supply under a meter-based contracting model, with on-site technical support provided by Litian Heavy Industry. (Period: October 2023 – June 2025).

 

Product Performance

Since the start of TBM excavation in October 2023, Litian has provided high-performance disc cutters and professional technical support, effectively overcoming a variety of complex geological challenges. During the excavation, Litian cutting tools assisted the TBM in achieving the outstanding results, with a maximum daily advance of 41.82 meters and a record monthly advance of 719.21 meters, strongly supporting the overall project progress.

 

 

Client Feedback

Litian Heavy Industry demonstrated excellent performance throughout the cutter supply contract. Deliveries were prompt, product quality was consistent, and the TBM cutters showed long service life without issues such as abnormal wear or cutter ring breakage. Their after-sales support was timely and professional, significantly improving construction efficiency. Litian is a trustworthy and reliable partner.


19inch-disc-cutter_.jpg


tbm-tunnelling.jpg



PREV :

This is the first one.

Litian Updates
Jul 23-2025
Working Together for 648 Days — Litian Contributes to the Successful Completion of the Fangxi Water Diversion Tunnel
On June 23, 2025, after 648 days of dedicated effort, the Fangxi Reservoir Water Diversion Tunnel in Linhai City was successfully completed. This milestone marks a major step forward in the city’s ke...
Mar 27-2025
How to Extend the Life of Your Rock Drill Shank?
Rock drill shanks are crucial components in the drilling process, helping to break through tough materials like rock, concrete, and stone. Over time, these shanks can experience wear and tear due to t...
FOLLOW US
Understanding Rock Drill Shanks: The Key to Efficient Drilling Operations